ZSS

Excel template · ZSS Method · Video mini-course

From idea to startup, with zero surprises

The complete system to manage industrial and capital (CAPEX) projects in a single Excel file: phases, approvals, costs, schedule, changes, meetings, validation and closeout. Ready for your next project.

Plan deep. Execute clean.  · Planea a fondo, ejecuta sin sorpresas.

Get ZSS US$39 US$49 Watch the video

New: ZSS Pro with multi-project portfolio · US$79

New: 2026 PMI certification practice exams · US$29

Project dashboardFilling line L3 installation · PRY-2026-014
Status date Jul 20, 2026
Approved budget$18.50 M
Total estimate$18.74 M
Committed$14.87 M
Paid$5.57 M
Actual progress57%
Planned progress67%

Project health

Cost● Critical−$238 k vs. approved
Schedule● Criticalindex 0.85
Risks● Watch1 high open
Action items● Watch2 overdue

Progress by phase and gate

  • 1. Initiate100%Approved
  • 2. Define100%Approved
  • 3. Engineering100%Approved
  • 4. Procurement100%Approved
  • 5. Execution43%Signing
  • 6. Startup0%Pending
  • 7. Closeout0%Pending

Cumulative payments vs. budget

Approved $18.5 M $13.9 M MarMayJulSepNov
Sheet: DashboardSample project included

Video overview

Everything included, in under a minute

A walkthrough of the sheets with the sample project loaded, the video mini-course and the ZSS Pro portfolio.

Video overview · 52 sNo audio

Sound familiar?

Execution surprises are planted at the start

Almost every problem that blows up on site or at startup had a cheap fix in an earlier phase. ZSS puts them on the table while they still cost little.

Production asks for something "everyone always knew", but nobody signed it.

Shows up in: Execution→ZSS: Initiate · signed requirements

The budget was already committed and unapproved changes appear.

Shows up in: Execution→ZSS: change control with sign-offs

The equipment arrives on time but misses the promised speed and efficiency.

Shows up in: Startup→ZSS: Define · acceptance criteria

The cheapest supplier was chosen and the real lead time doubled.

Shows up in: Execution→ZSS: bid comparison and decision matrix

Nobody reviewed last meeting's action items, so they were debated again.

Shows up: Every week→ZSS: minutes with open items from past meetings

The project "finished", but manuals, as-built drawings and asset registration are missing.

Shows up: Months later→ZSS: closeout checklist with status lights

The ZSS philosophy

A change on paper costs little. At startup it costs everything.

That is why the method puts the most effort into the first four phases: signed requirements, identified risks, a ±10% estimate, defined acceptance criteria and gates that are only approved when the whole team agrees. Execution and startup become the predictable part of the project.

Cost of a change and planning effort by phase Illustrative curve: the cost of a change grows with every phase and peaks at testing and startup; the ZSS method concentrates planning effort in phases 1 to 4. Cost of a change ZSS effort high low 1234 567 Initiate → ProcurementExecution → Closeout Project phase · illustrative chart

The ZSS method

7 phases. 7 gates. Nobody moves forward blind.

Every phase ends at a gate: a formal decision by the cross-functional team to continue, adjust or stop. The file records who approved, when and under what conditions.

Phase 1

Initiate

Business case, user requirements, team and order-of-magnitude estimate.

Is it worth defining?

Phase 2

Define

Project charter, in and out of scope, acceptance criteria, ±30% estimate.

Does it justify paying for engineering?

Phase 3

Engineering

Conceptual and detailed design, design review, test protocols, baseline and ±10% estimate.

Does it fit the budget?

Phase 4

Procurement

Quotes, weighted bid comparisons, contracts, bonds and purchase orders.

Contracts and bonds in place?

Phase 5

Execution

Field safety, schedule, payment cash flow, controlled changes and installation tests.

Installation released?

Phase 6

Testing & startup

Operational and performance tests, non-conformances, training and manuals.

Does it deliver what was promised?

Phase 7

Closeout

Handover, technical dossier, asset registration, final settlements and lessons learned.

Will anyone have to come back?

What's included

The whole project in one file

Connected sheets: enter data once and the rest calculates itself. No macros, so it opens in any Excel without security warnings.

24Connected sheets
47Phase deliverables
65Validation checks
47Project subfolders
12Team roles

Control and approvals

  • Dashboard with project health: cost, schedule, risks, quality and action items
  • 7-phase roadmap with 47 deliverables and the folder for each one
  • Gates signed off by every team role

Dashboard · Roadmap · Gates · Setup

Planning

  • Project charter with cross-functional sign-offs
  • RACI matrix with automatic check (one A per activity)
  • Visual communication plan with a typical week
  • Risk register with heat map and field hazard analysis

Charter · RACI · Communication · Risks · Safety

Cost and cash flow

  • Budget by line item in 3 estimate versions (±50%, ±30%, ±10%)
  • Quotes: only approved ones become committed cost
  • Monthly payment cash flow with bars per month and cumulative curve

Budget · Commitments · Cash flow

Schedule

  • Automatic Gantt by day, week or month
  • Calendar or working days
  • Actual vs. planned progress and late activities

Schedule

Procurement and changes

  • Technical and commercial bid comparison with weighted decision matrix
  • One form per change: justification, impacts and sign-offs
  • A log that fills itself and draws down contingency

Bid comparisons · CMP-01 · Changes · CC-001

Meetings, quality and closeout

  • Printable minutes with action items and open items from past meetings
  • Action items with status lights and workload by owner
  • 7-stage validation guide with release rules
  • Non-conformances, closeout checklist and lessons learned

Meetings · Minutes · Action items · Validation · Non-conformances · Closeout

Real views of the file

This is how it looks with a project loaded

These screenshots come from the included sample file: the fictional installation of a filling line, halfway through execution. Click to enlarge. The Excel sheets shown are the Spanish version.

Included · Video mini-course

Learn it in one afternoon

Lessons of about one minute, one per sheet, with the sample project on screen and subtitles. Watch them in the Hotmart members area, on your computer or phone.

27Lessons in ZSS
32Lessons in ZSS Pro
~1Minute per lesson
28Minutes in total
  1. 0Welcome and method3 lessons
  2. 1First steps3 lessons
  3. 2Planning7 lessons
  4. 3Costs3 lessons
  5. 4Schedule, procurement and changes3 lessons
  6. 5Execution, quality and closeout6 lessons
  7. 6ZSS Portfolio5 lessons · ZSS Pro only
  8. 7Your weekly routine2 lessons

The videos are in English, with subtitles.

New · ZSS Pro

Running several projects? See them all on one dashboard

ZSS Portfolio gathers one summary row from each ZSS project and tells you which are on track, which need a decision and which phase each one is in. Up to 30 projects, no macros.

1

Each project in its own file

Run each project with ZSS as usual. Its Portfolio sheet builds a row with cost, progress, health, phase and dates on its own.

2

Copy and paste the row

Copy that row and paste it as values in ZSS Portfolio. Under a minute per project, in any Excel.

3

Decide in the meeting

Review the dashboard and the Gantt, open the card of any project that needs it and log what the committee decides.

Is it for you?

Built for people who deliver projects in the plant

Yes, if you are…

  • A project manager or engineer in manufacturing, food and beverage, pharma or logistics
  • A contractor or integrator who wants to deliver with order and solid documentation
  • In charge of CAPEX, maintenance or plant engineering with several projects at once
  • A consultant who needs a clear method to present to clients

It's not for…

  • Software or agile sprint-based projects
  • Anyone looking for a multi-user online system (ZSS is an Excel file)
  • Anyone who works only in Google Sheets: some features behave differently

Launch price

Your next project, under control from day one

One payment, instant download, and use it on every project you need. Choose ZSS to run your projects, or ZSS Pro if you also want to see your whole portfolio.

FormatExcel (.xlsx), no macros
Works withMicrosoft 365 and Excel 2016 or later, on Windows and Mac
LanguageEnglish and Spanish
Mini-course27 short videos in English (32 in ZSS Pro)
ProtectionSheets protected without a password: you only type in input cells and formulas can't be deleted by accident
LicenseOne user or organization. Unlimited use on your projects.

ZSS · Complete kit

$39USD

Regular price US$49

  • Blank ZSS template, ready for your project
  • Sample file with a project loaded
  • Project folder with 8 folders and 47 subfolders
  • Validation guide with 65 verification checks
  • Video mini-course: 27 lessons
  • Instructions inside the file
Buy now

One-time payment · Instant access · 7-day guarantee

Most complete

ZSS Pro · Project + portfolio

$79USD

Regular price US$99

  • Everything in ZSS, in English and Spanish
  • Full mini-course: 32 lessons
  • ZSS Portfolio for up to 30 projects
  • Portfolio dashboard with status lights per project
  • Portfolio Gantt colored by phase
  • Project card and decision log
Buy ZSS Pro

One-time payment · Instant access · 7-day guarantee

Frequently asked questions

Before you buy

What's the difference between ZSS and ZSS Pro?

ZSS is the system to run each project. ZSS Pro includes all of ZSS plus ZSS Portfolio, to see and decide on several projects at once: dashboard, phase-colored Gantt, project card and decision log.

Does the portfolio update itself?

Each project calculates its summary row automatically. You copy it and paste it into the portfolio when you update the status date: under a minute per project, with no macros or connections, in any Excel.

Do I need to enable macros?

No. ZSS runs on Excel formulas only, so it opens without security warnings, even on company computers where macros are blocked.

Does it work for small projects?

Yes. Mark the deliverables your project doesn't need as "Not applicable" and progress is calculated with the ones that apply. An equipment swap or a line improvement fits just as well as a large project.

Can I use it on several projects?

Yes. Copy the whole project folder for each new project, rename it with the project number and start with the blank template inside.

Can I adapt it to my company?

Yes. Team roles, budget line items, evaluation criteria and validation checks are all in editable cells. Sheets are protected without a password, so you can unprotect them if you need to change anything else.

How many rows does each log have?

Every table comes with plenty of rows and formulas: 300 action items, 100 non-conformances, 60 quotes, 60 schedule activities and more than 100 validation checks, among others.

How do I receive it?

Once payment is complete you get instant access to the Hotmart members area, where you download the ZIP with the template, the sample file and the project folder, and watch the video mini-course.

What's in the mini-course?

27 video lessons of about one minute, one per sheet: the method, starting a project, planning, costs, schedule, procurement, changes, meetings, validation, closeout and the weekly routine. ZSS Pro adds 5 portfolio lessons. The videos are in English, with subtitles.

Does it work in Google Sheets?

It is designed for Microsoft Excel. It opens in Google Sheets, but some formatting, folder links and functions behave differently, so we don't recommend it.

What is the stage-gate method in industrial projects?

It splits the project into phases and ends each one with a formal review, the gate, where the team decides whether to continue, adjust or stop. ZSS uses 7 phases and 7 gates, and records who approved, when and on what conditions.

Does ZSS replace MS Project or Primavera P6?

It isn't a critical-path scheduler. ZSS brings together in one file what usually lives scattered: approvals, costs, changes, meetings, validation and closeout, with a Gantt that's enough for most plant projects. If your schedule has thousands of linked activities, keep your scheduler and run project control in ZSS.

What kinds of projects can I run with ZSS?

Capital (CAPEX) projects in plants: line and equipment installations, automation and robotics, civil and electrical works, warehouses and material handling, and process changes. It works the same for a small project as for a multi-million one.

Plan deep. Execute clean.

Launch price: ZSS US$39 · ZSS Pro US$79.

Choose my version